home sitemap contacts
About us References Consulting Key Experts Job Opportunities How to find us
SEEC logo -  energy and environment consulting company

• References » Project title »
Small Hydro Power Plants Doboj, Cijevna 5 and Cijevna 6 in Republic Of Srpska - Feasibility study

 

Country: Republic of Srpska

Client:Technor Energy AS, Norway

Beneficiary:Technor Energy AS, Norway

Name of partners: -

Dates (start/end): 2008

Description of project and our assignment:

Small hydro power plants Doboj, Cijevna 5 and Cijevna 6 are planned within integral project of development, protection and exploitation of the Bosna River course in the stretch between Doboj - Modriča, including also parts of the river stream through Doboj and Modriča cities. Feasibility Study is to investigate above mentioned facilities techno - economical validity and its impact both on power system of Republic of Srpska and on local environment and nature.


The services that will be rendered by the Consultant refer to the following activities:
  • Using the available input data related to the basic factor of the area related to morphological characteristics, existing and planned infrastructure and inhabitancy of the watercourse and watershed, as well as extent to which they have been investigated.
  • Conducting the comprehensive procedure of collecting all necessary input data like geodetic, hydrological, geological and hydro geological, seismological data as well as input data related to erosion and sediment transport and all other data that can make an contribution towards wide perception of all relevant factors.
  • To find optimal technical solution for these facilities construction. This includes the selection of conceptual solution for usage of technically exploitable hydropower potential, selection of key structures within hydropower plants, hydro-civil solutions. Also the potentials of the analyzed facilities investigations regarding calculation of power characteristics of plant, electromechanical equipment, hydro mechanical equipment, potable water supply to structures, wastewater, environmental impact assessment for hydropower plants is be conducted.
  • Estimation of both total and individual costs. Individual costs are to be broken down into costs of expropriation and compensations, costs of required investments prior to construction. Technical-economic analysis of hydropower plant construction feasibility, analysis of potential borrow pits for all types of building material, construction organization bases, conclusions, key proposals and recommendations for the next design phase, detailed proposal of all further investigation works required for input preparation are crucial part of the feasibility study results.




Project title  Client  Beneficiary   Name of partners  Status

Potential HPP Kupinski Kut and HPP Morava 1 - 7 in the Frame of Integral Water Resources Management of the Sava River - Pre - feasibility study

Private Client

 

 

Ongoing

Modernization and Rehabilitation of Perućica HPP - Phase II, Consulting Sevices

KfW, Germany

Electric Power Industry of Montenegro

Lahmeyer International GmbH

Ongoing

TPP Turceni Rehabilitation of Units 3 & 6Project Justification withinSEE POWER SYSTEM

TPP Turceni, Turceni, Romania

TPP Turceni, Turceni, Romania

 

Ongoing

Small Hydro Power Plants Doboj, Cijevna 5 and Cijevna 6 in Republic Of Srpska - Feasibility study

Technor Energy AS, Norway

Technor Energy AS, Norway

 

Ongoing

Tender documentation for procurement and installation of 110kV metal armored GIS for new SS 110/35/10 kV Kotor - Škaljari

Electric Power Industry of Montenegro,FU Prenos - "Elektroprenos" - Podgorica

Electric Power Industry of Montenegro,FU Prenos - "Elektroprenos" - Podgorica

 

Ongoing

Regional Facility for Renewable Energies and Energy Efficiency Facility

Frankfurt School of Finance & Management

 

Fichtner GmbH&Co.KG, Germany

Ongoing

400/110/35 kV Substation Ribarevine and 110/10 kV Substation Podgorica 5

KfW, Germany

EPCG

Fichtner GmbH&Co.KG, Germany

Ongoing

Integration of Baraha 400/132 kV substation into DEWA 400 kV system

Fichtner, Germany

DEWA, United Arab Emirates

 

Completed

Assessment of wind energy potential in Vršac

Potential investor

Potential investor, SEEC, Municipality of Vršac

Potential investor, SEEC, Municipality of Vršac

Ongoing

Pre-feasibility Study for Optimization of Water Resources Management for the Nisava River Catchment's Area

 

Municipality of Pirot, SEEC

Municipality of Pirot

Completed

Georgia Power Sector: Strategic Environmental Assessment (SEA)

World Bank

World Bank

 

Completed

Small Hydro Power Plants Cijevna 1, Cijevna 2, Cijevna 3 and Cijevna 4 in Republic of Srpska - Feasibility Study

Technor Energy AS, Norway

Technor Energy AS, Norway

Institute for civil works, Banja Luka and Faculty of civil engineering, University of Belgrade

Completed

PSHPP Tarnita - Effects Evaluation within Romanian and SEE Power System

World Bank

World Bank

 

Completed

Consultancy services in the process of privatization of five Small Hydro Power Plants (SHPP) in Montenegro

Private investor

Private investor

 

Completed

Small Hydro Power Plants Cijevna 1, Cijevna 2 and Cijevna 4 in Republic of Srpska - Pre-Feasibility Study

Technor Energy AS, Norway

Technor Energy AS, Norway

 

Completed

Analysis of the feasibility and possibility of the auxiliary power plant separation from CHP Zrenjanin

Electric Power Industry of Serbia, PC Panonske CHP's, Novi Sad

Electric Power Industry of Serbia and Municipality of Zrenjanin

 

Completed

Improvement of organizational, financial and investment performance of Electric Power Industry of Serbia – SECTION 2: Improvement of investment activities – Selection and attraction of the strategic partner for TPP Kolubara B construction and completion

EPS – Electric Power Industry of Serbia

EPS – Electric Power Industry of Serbia

EPIC, ETF

Completed

Khuzestan Master Plan

Khuzestan Regional Electric Company , Iran

Khuzestan Regional Electric Company , Iran

Fichtner GmbH&Co.KG , Germany

Completed

Transmission System Expansion Phase VI - Qatar

Qatar General Electricity & Water Corporation , Qatar

Qatar General Electricity & Water Corporation , Qatar

Fichtner GmbH&Co.KG , Germany

Completed

Consultancy Services on Rehabilitation of HPP Trebinje 1

KfW , Germany

HPP Trebinje 1 – ERS,

Bosnia & Herzegovina

Fichtner GmbH&Co.KG , Germany

Ongoing

Supervising Engineer for Environmental Projects in Thermal Power Stations, Serbia

European Agency of Reconstruction (EAR)

EPS - Electric power industry of Serbia - TPP Nikola Tesla B, TPP Kostolac A , Serbia

Vattenfall Europe Power Consult GmbH , Germany

Ongoing

Updating Generation Investment Study for South East Europe

World Bank

World Bank

Completed

Concession State Analysis of Small Hydro Sites and Feasibility of Concession Granting

Enel S.p.A, Italy

Enel S.p.A, Italy

Electroconsult, CESI , Italy

Completed

Study on Cogeneration of Heat and Electricity in Serbia

IFC – International Finance Corporation

IFC – International Finance Corporation

Electroconsult, CESI , Italy

Completed

Energy Sector Technical Assistance Project (ESTAP-II) –Feasibility Study for Kosovo B – Kashar (Albania) 400kV Transmission Interconnection Project (Task A) and Electricity Exchange Strategy Foundation (Task B).

World Bank

UNMIK , Kosovo

CESI , Italy

Completed

Technical Assistance in the Preparation of the EIB funded Project for Transmission System Rehabilitation

European Agency of Reconstruction (EAR)

EPS - Elektroistok - Transmission Company , Serbia

Fichtner GmbH&Co.KG , Germany

Completed

The Pre-Feasibility Study on Small Hydro Power plants Potential Sites in Serbia

Italian Ministry for Environment and Territory , Italy

Italian Ministry for Environment and Territory , Italy

Completed

JBIC Pilot Study for Project Formation for Transport Network Development in Western Balkan

Japan Bank for International Cooperation – JBIC , Japan

Japan Bank for International Cooperation – JBIC , Japan

EXeIdea Co., Ltd. , Japan

Completed

TPP Maritza East-1 (Bulgaria) Project Justification within SEE Power System

BNP Paribas and EBRD

AES Corporation , USA

Completed

Supervising Engineer for the Major Overhaul-Rehabilitation of Nikola Tesla A5 Thermal Power Plant

European Agency for Reconstruction

EPS – Electric Power Industry of Serbia

Vattenfall Europe Power Consult GmbH

Completed

Development of Power Generation in South East Europe - Implications for Investments in Environmental Protection

World Bank

SEE Power Utilities and Ministries of Energy

Completed

Generation Investment Study in South East Europe

EC and World Bank

SEE Power Utilities and Ministries of Energy

MWH , PWC, Atkins

Completed

Evaluation Unit of European Agency for Reconstruction

European Agency for Reconstruction

European Agency for Reconstruction

AGEG - German Association of Development Consultants

Completed

Home page