• References »
Project title »
Small Hydro Power Plants Doboj, Cijevna 5 and Cijevna 6 in Republic Of Srpska
- Feasibility study
Country: Republic of Srpska
Client:Technor Energy AS, Norway
Beneficiary:Technor Energy AS, Norway
Name of partners: -
Dates (start/end): 2008
Description of project and our assignment:
Small hydro power plants Doboj, Cijevna 5 and Cijevna 6 are planned within
integral project of development, protection and exploitation of the Bosna
River course in the stretch between Doboj - Modriča, including also parts
of the river stream through Doboj and Modriča cities. Feasibility Study
is to investigate above mentioned facilities techno - economical validity
and its impact both on power system of Republic of Srpska and on local
environment and nature.
The services that will be rendered by the Consultant refer to the following activities:
- Using the available input data related to the basic factor of the area related to morphological characteristics, existing and planned infrastructure and inhabitancy of the watercourse and watershed, as well as extent to which they have been investigated.
- Conducting the comprehensive procedure of collecting all necessary input data like geodetic, hydrological, geological and hydro geological, seismological data as well as input data related to erosion and sediment transport and all other data that can make an contribution towards wide perception of all relevant factors.
- To find optimal technical solution for these facilities construction. This includes the selection of conceptual solution for usage of technically exploitable hydropower potential, selection of key structures within hydropower plants, hydro-civil solutions. Also the potentials of the analyzed facilities investigations regarding calculation of power characteristics of plant, electromechanical equipment, hydro mechanical equipment, potable water supply to structures, wastewater, environmental impact assessment for hydropower plants is be conducted.
- Estimation of both total and individual costs. Individual costs are to be broken down into costs of expropriation and compensations, costs of required investments prior to construction. Technical-economic analysis of hydropower plant construction feasibility, analysis of potential borrow pits for all types of building material, construction organization bases, conclusions, key proposals and recommendations for the next design phase, detailed proposal of all further investigation works required for input preparation are crucial part of the feasibility study results.
|
| Project title |
Client |
Beneficiary |
Name of partners |
Status |
Potential
HPP Kupinski Kut and HPP Morava 1 - 7 in the Frame of Integral Water Resources
Management of the Sava River - Pre - feasibility study |
Private Client |
|
|
Ongoing |
Modernization
and Rehabilitation of Perućica HPP - Phase II, Consulting Sevices
|
KfW, Germany |
Electric Power Industry of Montenegro |
Lahmeyer International GmbH |
Ongoing |
TPP
Turceni Rehabilitation of Units 3 & 6Project Justification withinSEE POWER
SYSTEM |
TPP Turceni, Turceni, Romania |
TPP Turceni, Turceni, Romania |
|
Ongoing |
Small
Hydro Power Plants Doboj, Cijevna 5 and Cijevna 6 in Republic Of Srpska
- Feasibility study |
Technor Energy AS, Norway |
Technor Energy AS, Norway |
|
Ongoing |
Tender
documentation for procurement and installation of 110kV metal armored
GIS for new SS 110/35/10 kV Kotor - Škaljari |
Electric Power Industry of Montenegro,FU
Prenos - "Elektroprenos" - Podgorica |
Electric Power Industry of Montenegro,FU
Prenos - "Elektroprenos" - Podgorica |
|
Ongoing |
Regional
Facility for Renewable Energies and Energy Efficiency Facility |
Frankfurt School of Finance & Management |
|
Fichtner GmbH&Co.KG, Germany |
Ongoing |
400/110/35
kV Substation Ribarevine and 110/10 kV Substation Podgorica 5 |
KfW, Germany |
EPCG |
Fichtner GmbH&Co.KG, Germany |
Ongoing |
Integration
of Baraha 400/132 kV substation into DEWA 400 kV system |
Fichtner, Germany |
DEWA, United Arab Emirates |
|
Completed |
Assessment
of wind energy potential in Vršac |
Potential investor |
Potential investor, SEEC, Municipality
of Vršac |
Potential investor, SEEC, Municipality
of Vršac |
Ongoing |
Pre-feasibility
Study for Optimization of Water Resources Management for the Nisava River
Catchment's Area |
|
Municipality of Pirot, SEEC |
Municipality of Pirot |
Completed |
Georgia Power Sector: Strategic Environmental Assessment (SEA) |
World Bank |
World Bank |
|
Completed |
Small
Hydro Power Plants Cijevna 1, Cijevna 2, Cijevna 3 and Cijevna 4 in Republic
of Srpska - Feasibility Study |
Technor Energy AS, Norway |
Technor Energy AS, Norway |
Institute for civil works, Banja Luka and Faculty of civil engineering, University of Belgrade |
Completed |
PSHPP
Tarnita - Effects Evaluation within Romanian and SEE Power System
|
World Bank |
World Bank |
|
Completed |
Consultancy
services in the process of privatization of five Small Hydro Power Plants
(SHPP) in Montenegro |
Private investor |
Private investor |
|
Completed |
Small
Hydro Power Plants Cijevna 1, Cijevna 2 and Cijevna 4 in Republic of Srpska
- Pre-Feasibility Study |
Technor Energy AS, Norway |
Technor Energy AS, Norway |
|
Completed |
Analysis
of the feasibility and possibility of the auxiliary power plant separation
from CHP Zrenjanin |
Electric Power Industry
of Serbia, PC Panonske CHP's, Novi Sad |
Electric Power Industry
of Serbia and Municipality of Zrenjanin |
|
Completed |
Improvement
of organizational, financial and investment performance of Electric Power
Industry of Serbia – SECTION 2: Improvement of investment activities
– Selection and attraction of the strategic partner for TPP Kolubara
B construction and completion |
EPS – Electric Power
Industry of Serbia |
EPS – Electric Power
Industry of Serbia |
EPIC, ETF |
Completed |
Khuzestan
Master Plan |
Khuzestan Regional Electric
Company , Iran |
Khuzestan Regional Electric
Company , Iran |
Fichtner GmbH&Co.KG
, Germany |
Completed |
Transmission
System Expansion Phase VI - Qatar |
Qatar General Electricity
& Water Corporation , Qatar |
Qatar General Electricity
& Water Corporation , Qatar |
Fichtner GmbH&Co.KG
, Germany |
Completed |
Consultancy
Services on Rehabilitation of HPP Trebinje 1 |
KfW , Germany |
HPP Trebinje 1 – ERS,
Bosnia & Herzegovina |
Fichtner GmbH&Co.KG
, Germany |
Ongoing |
Supervising
Engineer for Environmental Projects in Thermal Power Stations, Serbia
|
European Agency of Reconstruction
(EAR) |
EPS - Electric power industry
of Serbia - TPP Nikola Tesla B, TPP Kostolac A , Serbia |
Vattenfall Europe Power
Consult GmbH , Germany |
Ongoing |
Updating
Generation Investment Study for South East Europe |
World Bank |
World Bank |
|
Completed |
Concession
State Analysis of Small Hydro Sites and Feasibility of Concession Granting |
Enel S.p.A, Italy |
Enel S.p.A, Italy |
Electroconsult, CESI , Italy
|
Completed |
| Study
on Cogeneration of Heat and Electricity in Serbia |
IFC – International Finance
Corporation |
IFC – International Finance
Corporation |
Electroconsult, CESI , Italy
|
Completed |
Energy
Sector Technical Assistance Project (ESTAP-II) –Feasibility Study for
Kosovo B – Kashar (Albania) 400kV Transmission Interconnection Project
(Task A) and Electricity Exchange Strategy Foundation (Task B). |
World Bank |
UNMIK , Kosovo |
CESI , Italy |
Completed |
Technical
Assistance in the Preparation of the EIB funded Project for Transmission
System Rehabilitation |
European Agency of Reconstruction
(EAR) |
EPS - Elektroistok - Transmission
Company , Serbia |
Fichtner GmbH&Co.KG
, Germany |
Completed |
The
Pre-Feasibility Study on Small Hydro Power plants Potential Sites in Serbia
|
Italian Ministry for Environment
and Territory , Italy |
Italian Ministry for Environment
and Territory , Italy |
|
Completed |
JBIC
Pilot Study for Project Formation for Transport Network Development in
Western Balkan |
Japan Bank for International
Cooperation – JBIC , Japan |
Japan Bank for International
Cooperation – JBIC , Japan |
EXeIdea Co., Ltd. , Japan
|
Completed |
TPP
Maritza East-1 (Bulgaria) Project Justification within SEE Power System
|
BNP Paribas and EBRD |
AES Corporation , USA |
|
Completed |
Supervising
Engineer for the Major Overhaul-Rehabilitation of Nikola Tesla A5 Thermal
Power Plant |
European Agency for Reconstruction
|
EPS – Electric Power Industry
of Serbia |
Vattenfall Europe Power
Consult GmbH |
Completed |
Development
of Power Generation in South East Europe - Implications for Investments
in Environmental Protection |
World Bank |
SEE Power Utilities and
Ministries of Energy |
|
Completed |
Generation
Investment Study in South East Europe |
EC and World Bank |
SEE Power Utilities and
Ministries of Energy |
MWH , PWC, Atkins |
Completed |
Evaluation
Unit of European Agency for Reconstruction |
European Agency for Reconstruction
|
European Agency for Reconstruction
|
AGEG - German
Association of Development Consultants |
Completed |